Video Data Collection and Online Service Assignments

For more information on our versitile VCUs and sample reports check out our Equipment and Services Pages.

 

 2009                       Juniper Roundabout, Kamloops

On March 26th we conducted a demonstration VCU count.  The camera collected 6 hours of video which were uploaded.  A 1 hour sample report was created.

 

 

 

 

  

2009                       Trans Canada Highway at Vicars Road, Kamloops

The first demonstration was at a roundabout.  We chose a busy intersection for the second location.  Again a 1 hour sample report was created. 

 

 

 

 

  

2009                       Trans Canada Highway at Stoney Flats Road, Pritchard

The design of the interchange to replace this intersection east of Kamloops at Pritchard was complicated by the store that services highway and local traffic.  There is also a rail crossing on the side road.  The designers needed to better understand the travel patterns of local residents, the volume of through traffic stopping at the store and queue lengths generated at the rail crossing.  We combined a manual and video count to cover the movements at the intersection and store accesses.

 

     top

2009                       Nicola Interchange, Pedestrian count

This structure carries Hwy 5A over the Coquihalla Hwy 5 on the north side of Merritt.  There is a population base and highway commercial development on the west side of HWY 5 with a new commercial development on the east side of the highway.  Although there are painted shoulders across the structure, there are no sidewalks or physical separation between vehicles and pedestrians.  The VCU was an ideal solution to count pedestrian trips at various times of day and night as well as days of the week.

 

 

   

2010                       Hwy 3, Hwy 6 intersection, Salmo

Due to the replacement of the Carney Mills Bridge in Salmo a better understanding of the vehicle and pedestrian traffic patterns was needed to minimize disruptions during construction.

In addition to 2 video intersection counts on Hwy3 we conducted a 24 hour hose count on the bridge and a 4 hour manual pedestrian count.

 

 

 

 

  

2010                       Hwy 3 at Carney Bridge Rd., Salmo

The second VCU count in Salmo was at this intersection where the bridge is accessed from the highway.

 

 

 

 

  top

 2011                       Conklin, Alberta

Video was collected at 3 intersections for 14 to 16 hours per day for 5 days. This Turning Movement Study was for vehicles, divided into 3 classifications.

data was collected in conjunction with a manual Origin, Destination study with observers at other nearby locations.

 

 

  

 

 

2012                       Wabasca-Desmarais, Alberta

Video was collected at 3 intersections for 14 hours per day for 5 days during February.  This Turning Movement Study was for vehicles, divided into 3 classifications.

 

 

 

 

 

 

2012                       Big White

Video was collected at the Intersection of Hwy 33 with Big White Road for 72 consecutive hours.  This Turning Movement Study was for vehicles, divided into 4 classifications.

This data was collected in conjunction with a manual Laser Speed study on the hill to the north.

 

 

 

 

   top

2012                       Radium Hot Springs

Video was collected at the Intersection of Hwy 93 / 95 with Hwy 93 for 15 hours per day for 7 days.  This Study collected classified vehicle counts and pedestrians.

 

 

 

  

 

2012                       Crystal Waters, Lake Country

Video was collected at the Intersection of Hwy 97 and Crystal Waters Road for 7 hours per day for 7 days.  This Study was a classified vehicle count.

 

 

 

 

 

 

 

 top

 

 

 

Comments are closed.